Natural gas power plant · Sandusky, OH
Clyde Peaking Engine
Clyde Peaking Engine is a 10 MW natural gas power plant in Sandusky County, Ohio, operated by Onsite Partners, LLC. Its oldest generator still running came online in 2020. In 2025 it generated 0.8 GWh, about what 76 average Ohio homes use in a year.
Clyde Peaking Engine in context
Among the 48 natural gas plants in Ohio in the EIA's inventory, it is the 40th largest, about 0.1% of the state's 20 GW of natural gas capacity.
Sandusky County has 5 power plants of 1 MW or more with 760 MW in all; Clyde Peaking Engine is 1% of that and the 2nd largest of 2 natural gas plants there.
Its capacity factor of 1% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Sandusky County goes 2.3 hours a year without power, the 82nd most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Clyde Peaking Engine (outlined) and other plants in Sandusky County, shaded. 41.293, -82.965.
Plant facts
- Operator
- Onsite Partners, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Sandusky County, OH
- EIA plant ID
- 64157
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CPG | Natural Gas Internal Combustion Engine | 10 MW | 2020 | – |
Nearby
Other plants in Sandusky County
Questions
Clyde Peaking Engine, answered
How much power does Clyde Peaking Engine produce?
Clyde Peaking Engine has 10 MW of capacity from one generator. In 2025 it generated 0.8 GWh, 1% of the most it could have made running flat out all year (its capacity factor).
How many homes does Clyde Peaking Engine power?
Its 2025 output of 0.8 GWh equals the yearly electricity use of about 76 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Clyde Peaking Engine?
Clyde Peaking Engine is in Sandusky County, Ohio, at about 41.293°, -82.965°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Sandusky County goes 2.3 hours a year without power, the 82nd most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Clyde Peaking Engine?
It is operated by Onsite Partners, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Clyde Peaking Engine open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.