Wind power plant · Steuben, NY
Cohocton Wind Project
Cohocton Wind Project is a 88 MW wind power plant in Steuben County, New York, operated by Evergreen Wind, LLC. Its oldest generator still running came online in 2009. In 2025 it generated 206 GWh, about what 29,000 average New York homes use in a year.
Cohocton Wind Project in context
Among the 34 wind plants in New York in the EIA's inventory, it is the 18th largest, about 2.9% of the state's 3.0 GW of wind capacity.
Steuben County has 13 power plants of 1 MW or more with 568 MW in all; Cohocton Wind Project is 15% of that and the 4th largest of 7 wind plants there.
Its capacity factor of 27% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Steuben County goes 12 hours a year without power, the 12th most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Cohocton Wind Project (outlined) and other plants in Steuben County, shaded. 42.450, -77.520.
Plant facts
- Operator
- Evergreen Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- NYIS
- County
- Steuben County, NY
- EIA plant ID
- 56634
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 88 MW | 2009 | – |
Nearby
Other plants in Steuben County
Questions
Cohocton Wind Project, answered
How much power does Cohocton Wind Project produce?
Cohocton Wind Project has 88 MW of capacity from one generator. In 2025 it generated 206 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Cohocton Wind Project power?
Its 2025 output of 206 GWh equals the yearly electricity use of about 29,000 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Cohocton Wind Project?
Cohocton Wind Project is in Steuben County, New York, at about 42.450°, -77.520°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Steuben County goes 12 hours a year without power, the 12th most of 62 counties in New York. The county's page has the full outage record.
Who operates Cohocton Wind Project?
It is operated by Evergreen Wind, LLC (EIA sector: IPP Non-CHP), and it feeds the New York ISO.
When did Cohocton Wind Project open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.