Coal power plant · Columbia, WI
Columbia (WI)
Columbia (WI) is a 1.1 GW coal power plant in Columbia County, Wisconsin, operated by Wisconsin Power & Light Co. Its oldest generator still running came online in 1975. In 2025 it generated 6.0 TWh, about what 744,000 average Wisconsin homes use in a year.
Columbia (WI) in context
Among the 7 coal plants in Wisconsin in the EIA's inventory, it is the 2nd largest, about 22% of the state's 5.0 GW of coal capacity.
Columbia County has 5 power plants of 1 MW or more with 1.3 GW in all; Columbia (WI) is 86% of that.
Its capacity factor of 61% in 2025 is higher than the 45% typical for coal plants across the US.
The average electricity customer in Columbia County goes 1.4 hours a year without power, the 61st most of 72 counties in Wisconsin. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Columbia (WI) (outlined) and other plants in Columbia County, shaded. 43.486, -89.420.
Plant facts
- Operator
- Wisconsin Power & Light Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Columbia County, WI
- EIA plant ID
- 8023
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Steam Coal | 556 MW | 1975 | 2029 |
| 2 | Conventional Steam Coal | 556 MW | 1978 | 2029 |
Nearby
Other plants in Columbia County
Questions
Columbia (WI), answered
How much power does Columbia (WI) produce?
Columbia (WI) has 1.1 GW of capacity from 2 generators. In 2025 it generated 6.0 TWh, 61% of the most it could have made running flat out all year (its capacity factor).
How many homes does Columbia (WI) power?
Its 2025 output of 6.0 TWh equals the yearly electricity use of about 744,000 average Wisconsin homes (667 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Columbia (WI)?
Columbia (WI) is in Columbia County, Wisconsin, at about 43.486°, -89.420°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Columbia County goes 1.4 hours a year without power, the 61st most of 72 counties in Wisconsin. The county's page has the full outage record.
Who operates Columbia (WI)?
It is operated by Wisconsin Power & Light Co (EIA sector: Electric Utility), and it feeds MISO.
When did Columbia (WI) open?
Its oldest generator still running came online in 1975. Planned retirements are scheduled for 2029.