Coal power plant · Apache, AZ
Coronado
Coronado is a 822 MW coal power plant in Apache County, Arizona, operated by Salt River Project. Its oldest generator still running came online in 1979. In 2025 it generated 2.9 TWh, about what 237,000 average Arizona homes use in a year.
Coronado in context
Among the 2 coal plants in Arizona in the EIA's inventory, it is the 2nd largest, about 32% of the state's 2.6 GW of coal capacity.
Apache County has 3 power plants of 1 MW or more with 2.6 GW in all; Coronado is 32% of that and the 2nd largest of 2 coal plants there.
Its capacity factor of 41% in 2025 is close to the 45% typical for coal plants across the US.
The average electricity customer in Apache County goes 1.8 hours a year without power, the 4th most of 11 counties in Arizona. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Coronado (outlined) and other plants in Apache County, shaded. 34.579, -109.271.
Plant facts
- Operator
- Salt River Project
- Sector
- Electric Utility
- Grid operator
- SRP
- County
- Apache County, AZ
- EIA plant ID
- 6177
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CO1 | Conventional Steam Coal | 411 MW | 1979 | 2032 |
| CO2 | Conventional Steam Coal | 411 MW | 1980 | 2032 |
Nearby
Other plants in Apache County
Questions
Coronado, answered
How much power does Coronado produce?
Coronado has 822 MW of capacity from 2 generators. In 2025 it generated 2.9 TWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Coronado power?
Its 2025 output of 2.9 TWh equals the yearly electricity use of about 237,000 average Arizona homes (1,030 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Coronado?
Coronado is in Apache County, Arizona, at about 34.579°, -109.271°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Apache County goes 1.8 hours a year without power, the 4th most of 11 counties in Arizona. The county's page has the full outage record.
Who operates Coronado?
It is operated by Salt River Project (EIA sector: Electric Utility), and it feeds Salt River Project.
When did Coronado open?
Its oldest generator still running came online in 1979. Planned retirements are scheduled for 2032.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Arizona home's 1,030 kWh a month in 2025. Methodology.