Wind power plant · Brookings, SD
Coyote Ridge
Coyote Ridge is a 97 MW wind power plant in Brookings County, South Dakota, operated by Coyote Ridge LLC. Its oldest generator still running came online in 2019. In 2025 it generated 393 GWh, about what 33,000 average South Dakota homes use in a year.
Coyote Ridge in context
Among the 25 wind plants in South Dakota in the EIA's inventory, it is the 16th largest, about 2.8% of the state's 3.5 GW of wind capacity.
Brookings County has 4 power plants of 1 MW or more with 682 MW in all; Coyote Ridge is 14% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 46% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Brookings County goes 2.1 hours a year without power, the 31st most of 32 counties in South Dakota. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Coyote Ridge (outlined) and other plants in Brookings County, shaded. 44.450, -96.550.
Plant facts
- Operator
- Coyote Ridge LLC
- Sector
- IPP Non-CHP
- Grid operator
- WACM
- County
- Brookings County, SD
- EIA plant ID
- 61047
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 97 MW | 2019 | – |
Nearby
Other plants in Brookings County
Questions
Coyote Ridge, answered
How much power does Coyote Ridge produce?
Coyote Ridge has 97 MW of capacity from one generator. In 2025 it generated 393 GWh, 46% of the most it could have made running flat out all year (its capacity factor).
How many homes does Coyote Ridge power?
Its 2025 output of 393 GWh equals the yearly electricity use of about 33,000 average South Dakota homes (984 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Coyote Ridge?
Coyote Ridge is in Brookings County, South Dakota, at about 44.450°, -96.550°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Brookings County goes 2.1 hours a year without power, the 31st most of 32 counties in South Dakota. The county's page has the full outage record.
Who operates Coyote Ridge?
It is operated by Coyote Ridge LLC (EIA sector: IPP Non-CHP), and it feeds WAPA Rocky Mountain.
When did Coyote Ridge open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average South Dakota home's 984 kWh a month in 2025. Methodology.