Solar power plant · Jefferson, WI
Crawfish River
Crawfish River is a 75 MW solar power plant in Jefferson County, Wisconsin, operated by Wisconsin Power & Light Co. Its oldest generator still running came online in 2023. In 2025 it generated 131 GWh, about what 16,000 average Wisconsin homes use in a year.
Crawfish River in context
Among the 116 solar plants in Wisconsin in the EIA's inventory, it is the 13th largest, about 2.6% of the state's 2.8 GW of solar capacity.
Jefferson County has 8 power plants of 1 MW or more with 760 MW in all; Crawfish River is 10% of that and the largest of 5 solar plants there.
Its capacity factor of 20% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Jefferson County goes 5.5 hours a year without power, the 18th most of 72 counties in Wisconsin. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Crawfish River (outlined) and other plants in Jefferson County, shaded. 43.000, -88.876.
Plant facts
- Operator
- Wisconsin Power & Light Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Jefferson County, WI
- EIA plant ID
- 65012
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 75 MW | 2023 | – |
Nearby
Other plants in Jefferson County
Questions
Crawfish River, answered
How much power does Crawfish River produce?
Crawfish River has 75 MW of capacity from one generator. In 2025 it generated 131 GWh, 20% of the most it could have made running flat out all year (its capacity factor).
How many homes does Crawfish River power?
Its 2025 output of 131 GWh equals the yearly electricity use of about 16,000 average Wisconsin homes (667 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Crawfish River?
Crawfish River is in Jefferson County, Wisconsin, at about 43.000°, -88.876°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Jefferson County goes 5.5 hours a year without power, the 18th most of 72 counties in Wisconsin. The county's page has the full outage record.
Who operates Crawfish River?
It is operated by Wisconsin Power & Light Co (EIA sector: Electric Utility), and it feeds MISO.
When did Crawfish River open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Wisconsin home's 667 kWh a month in 2025. Methodology.