Storage power plant · Danville, VA
Danville BESS 1
Danville BESS 1 is a 11 MW storage power plant in Danville city, Virginia, operated by Doc Brown LLC. Its oldest generator still running came online in 2022.
Danville BESS 1 in context
Among the 6 storage plants in Virginia in the EIA's inventory, it is the 5th largest, about 0.3% of the state's 3.1 GW of storage capacity.
The average electricity customer in Danville city goes 7.4 hours a year without power, the 87th most of 123 counties in Virginia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Danville BESS 1 (outlined) and other plants in Danville city, shaded. 36.579, -79.384.
Plant facts
- Operator
- Doc Brown LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Danville city, VA
- EIA plant ID
- 65499
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 90909 | Batteries | 11 MW · 25 MWh | 2022 | – |
Questions
Danville BESS 1, answered
How much can Danville BESS 1 store and deliver?
Danville BESS 1 can deliver up to 11 MW and hold 25 MWh of energy, from one battery or storage system. Its net energy in 2025 was -1.9 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Danville BESS 1?
Danville BESS 1 is in Danville city, Virginia, at about 36.579°, -79.384°. The average electricity customer in Danville city goes 7.4 hours a year without power, the 87th most of 123 counties in Virginia. The county's page has the full outage record.
Who operates Danville BESS 1?
It is operated by Doc Brown LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Danville BESS 1 open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Methodology.