De Pere Energy Center is a 192 MW natural gas power plant in Brown County, Wisconsin, operated by Wisconsin Public Service Corp. Its oldest generator still running came online in 1999. In 2025 it generated 180 GWh, about what 23,000 average Wisconsin homes use in a year.
De Pere Energy Center in context
Among the 38 natural gas plants in Wisconsin in the EIA's inventory, it is the 14th largest, about 2.4% of the state's 8.1 GW of natural gas capacity.
Brown County has 5 power plants of 1 MW or more with 352 MW in all; De Pere Energy Center is 55% of that and the largest of 3 natural gas plants there.
Its capacity factor of 11% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Brown County goes 2.0 hours a year without power, the 46th most of 72 counties in Wisconsin. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
De Pere Energy Center (outlined) and other plants in Brown County, shaded. 44.449, -88.072.
Plant facts
- Operator
- Wisconsin Public Service Corp
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Brown County, WI
- EIA plant ID
- 55029
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CT01 | Natural Gas Fired Combustion Turbine | 192 MW | 1999 | – |
Nearby
Other plants in Brown County
Questions
De Pere Energy Center, answered
How much power does De Pere Energy Center produce?
De Pere Energy Center has 192 MW of capacity from one generator. In 2025 it generated 180 GWh, 11% of the most it could have made running flat out all year (its capacity factor).
How many homes does De Pere Energy Center power?
Its 2025 output of 180 GWh equals the yearly electricity use of about 23,000 average Wisconsin homes (667 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is De Pere Energy Center?
De Pere Energy Center is in Brown County, Wisconsin, at about 44.449°, -88.072°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Brown County goes 2.0 hours a year without power, the 46th most of 72 counties in Wisconsin. The county's page has the full outage record.
Who operates De Pere Energy Center?
It is operated by Wisconsin Public Service Corp (EIA sector: Electric Utility), and it feeds MISO.
When did De Pere Energy Center open?
Its oldest generator still running came online in 1999.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Wisconsin home's 667 kWh a month in 2025. Methodology.