Solar power plant · Carroll, MS
Delta's Edge Solar
Delta's Edge Solar is a 100 MW solar power plant in Carroll County, Mississippi, operated by Cubico USA, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 114 GWh, about what 8,000 average Mississippi homes use in a year.
Delta's Edge Solar in context
Among the 25 solar plants in Mississippi in the EIA's inventory, it is the 8th largest, about 5.3% of the state's 1.9 GW of solar capacity.
Its capacity factor of 13% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Carroll County goes 5.8 hours a year without power, the 57th most of 74 counties in Mississippi. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Delta's Edge Solar (outlined) and other plants in Carroll County, shaded. 33.500, -90.100.
Plant facts
- Operator
- Cubico USA, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Carroll County, MS
- EIA plant ID
- 66759
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DELTA | Solar Photovoltaic | 100 MW | 2023 | – |
Questions
Delta's Edge Solar, answered
How much power does Delta's Edge Solar produce?
Delta's Edge Solar has 100 MW of capacity from one generator. In 2025 it generated 114 GWh, 13% of the most it could have made running flat out all year (its capacity factor).
How many homes does Delta's Edge Solar power?
Its 2025 output of 114 GWh equals the yearly electricity use of about 8,000 average Mississippi homes (1,184 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Delta's Edge Solar?
Delta's Edge Solar is in Carroll County, Mississippi, at about 33.500°, -90.100°. The average electricity customer in Carroll County goes 5.8 hours a year without power, the 57th most of 74 counties in Mississippi. The county's page has the full outage record.
Who operates Delta's Edge Solar?
It is operated by Cubico USA, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Delta's Edge Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Mississippi home's 1,184 kWh a month in 2025. Methodology.