Wind power plant · Coahoma, MS
Delta Wind Farm (MS)
Delta Wind Farm (MS) is a 185 MW wind power plant in Coahoma County, Mississippi, operated by AES Clean Energy. Its oldest generator still running came online in 2024. In 2025 it generated 500 GWh, about what 35,000 average Mississippi homes use in a year.
Delta Wind Farm (MS) in context
Coahoma County has 3 power plants of 1 MW or more with 546 MW in all; Delta Wind Farm (MS) is 34% of that.
Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Coahoma County goes 5.3 hours a year without power, the 59th most of 74 counties in Mississippi. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Delta Wind Farm (MS) (outlined) and other plants in Coahoma County, shaded. 34.469, -90.393.
Plant facts
- Operator
- AES Clean Energy
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Coahoma County, MS
- EIA plant ID
- 66000
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DLTA | Onshore Wind Turbine | 185 MW | 2024 | – |
Nearby
Other plants in Coahoma County
Questions
Delta Wind Farm (MS), answered
How much power does Delta Wind Farm (MS) produce?
Delta Wind Farm (MS) has 185 MW of capacity from one generator. In 2025 it generated 500 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Delta Wind Farm (MS) power?
Its 2025 output of 500 GWh equals the yearly electricity use of about 35,000 average Mississippi homes (1,184 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Delta Wind Farm (MS)?
Delta Wind Farm (MS) is in Coahoma County, Mississippi, at about 34.469°, -90.393°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Coahoma County goes 5.3 hours a year without power, the 59th most of 74 counties in Mississippi. The county's page has the full outage record.
Who operates Delta Wind Farm (MS)?
It is operated by AES Clean Energy (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Delta Wind Farm (MS) open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Mississippi home's 1,184 kWh a month in 2025. Methodology.