Storage power plant · Dickens, TX
Dickens
Dickens is a 200 MW storage power plant in Dickens County, Texas, operated by Engie North America. Its oldest generator still running came online in 2024.
Dickens in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 18th largest, about 1.2% of the state's 16 GW of storage capacity.
Dickens County has 3 power plants of 1 MW or more with 450 MW in all; Dickens is 44% of that and the largest of 2 storage plants there.
The average electricity customer in Dickens County goes 7.9 hours a year without power, the 146th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Dickens (outlined) and other plants in Dickens County, shaded. 33.781, -100.883.
Plant facts
- Operator
- Engie North America
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Dickens County, TX
- EIA plant ID
- 65489
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DIKNS | Batteries | 200 MW · 200 MWh | 2024 | – |
Nearby
Other plants in Dickens County
Questions
Dickens, answered
How much can Dickens store and deliver?
Dickens can deliver up to 200 MW and hold 200 MWh of energy, from one battery or storage system. Its net energy in 2025 was -9.5 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Dickens?
Dickens is in Dickens County, Texas, at about 33.781°, -100.883°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Dickens County goes 7.9 hours a year without power, the 146th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Dickens?
It is operated by Engie North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Dickens open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Methodology.