Wind power plant · Baylor, TX

Diversion Wind Energy LLC

Diversion Wind Energy LLC is a 201 MW wind power plant in Baylor County, Texas, operated by Southwestern Electric Power Co. Its oldest generator still running came online in 2024. In 2025 it generated 727 GWh, about what 55,000 average Texas homes use in a year.

Capacity201 MWNameplate, September 2026
Generated727 GWhIn 2025
Capacity factor41%Share of the most it could make, 2025
Generators2Oldest from 2024

Diversion Wind Energy LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 92nd largest, about 0.4% of the state's 45 GW of wind capacity.

Baylor County has 3 power plants of 1 MW or more with 381 MW in all; Diversion Wind Energy LLC is 53% of that and the largest of 3 wind plants there.

Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Baylor County goes 9.7 hours a year without power, the 121st most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020242025GWh 727
020040060080020242025727

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Diversion Wind Energy LLC (outlined) and other plants in Baylor County, shaded. 33.719, -99.023.

Plant facts

Operator
Southwestern Electric Power Co
Sector
Electric Utility
Grid operator
SWPP
County
Baylor County, TX
EIA plant ID
67601
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
DIV02 Onshore Wind Turbine 102 MW 2024 –
DIV01 Onshore Wind Turbine 99 MW 2024 –

Questions

Diversion Wind Energy LLC, answered

How much power does Diversion Wind Energy LLC produce?

Diversion Wind Energy LLC has 201 MW of capacity from 2 generators. In 2025 it generated 727 GWh, 41% of the most it could have made running flat out all year (its capacity factor).

How many homes does Diversion Wind Energy LLC power?

Its 2025 output of 727 GWh equals the yearly electricity use of about 55,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Diversion Wind Energy LLC?

Diversion Wind Energy LLC is in Baylor County, Texas, at about 33.719°, -99.023°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Baylor County goes 9.7 hours a year without power, the 121st most of 240 counties in Texas. The county's page has the full outage record.

Who operates Diversion Wind Energy LLC?

It is operated by Southwestern Electric Power Co (EIA sector: Electric Utility), and it feeds the Southwest Power Pool.

When did Diversion Wind Energy LLC open?

Its oldest generator still running came online in 2024.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.