Solar power plant · Highland, OH
Dodson Creek Solar, LLC
Dodson Creek Solar, LLC is a 117 MW solar power plant in Highland County, Ohio, operated by Geronimo Power. Its oldest generator still running came online in 2025. In 2025 it generated 166 GWh, about what 16,000 average Ohio homes use in a year.
Dodson Creek Solar, LLC in context
Among the 77 solar plants in Ohio in the EIA's inventory, it is the 17th largest, about 2.4% of the state's 5.0 GW of solar capacity.
Highland County has 4 power plants of 1 MW or more with 667 MW in all; Dodson Creek Solar, LLC is 18% of that and the 3rd largest of 4 solar plants there.
The average electricity customer in Highland County goes 5.6 hours a year without power, the 44th most of 88 counties in Ohio. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Dodson Creek Solar, LLC (outlined) and other plants in Highland County, shaded. 39.181, -83.768.
Plant facts
- Operator
- Geronimo Power
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Highland County, OH
- EIA plant ID
- 69550
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| DODSN | Solar Photovoltaic | 117 MW | 2025 | – |
Nearby
Other plants in Highland County
Questions
Dodson Creek Solar, LLC, answered
How much power does Dodson Creek Solar, LLC produce?
Dodson Creek Solar, LLC has 117 MW of capacity from one generator. In 2025 it generated 166 GWh.
How many homes does Dodson Creek Solar, LLC power?
Its 2025 output of 166 GWh equals the yearly electricity use of about 16,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Dodson Creek Solar, LLC?
Dodson Creek Solar, LLC is in Highland County, Ohio, at about 39.181°, -83.768°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Highland County goes 5.6 hours a year without power, the 44th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Dodson Creek Solar, LLC?
It is operated by Geronimo Power (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Dodson Creek Solar, LLC open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.