Solar power plant · Dolores, CO
Dolores Canyon Solar
Dolores Canyon Solar is a 110 MW solar power plant in Dolores County, Colorado, operated by Tri-State G & T Assn, Inc. Its oldest generator still running came online in 2025. In 2025 it generated 22 GWh, about what 2,700 average Colorado homes use in a year.
Dolores Canyon Solar in context
Among the 185 solar plants in Colorado in the EIA's inventory, it is the 11th largest, about 2.9% of the state's 3.8 GW of solar capacity.
Seasons
Month by month, 2025
Where it is
Dolores Canyon Solar (outlined) and other plants in Dolores County, shaded. 37.705, -108.755.
Plant facts
- Operator
- Tri-State G & T Assn, Inc
- Sector
- Electric Utility
- Grid operator
- WACM
- County
- Dolores County, CO
- EIA plant ID
- 64858
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| C0497 | Solar Photovoltaic | 110 MW | 2025 | – |
Questions
Dolores Canyon Solar, answered
How much power does Dolores Canyon Solar produce?
Dolores Canyon Solar has 110 MW of capacity from one generator. In 2025 it generated 22 GWh.
How many homes does Dolores Canyon Solar power?
Its 2025 output of 22 GWh equals the yearly electricity use of about 2,700 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Dolores Canyon Solar?
Dolores Canyon Solar is in Dolores County, Colorado, at about 37.705°, -108.755°.
Who operates Dolores Canyon Solar?
It is operated by Tri-State G & T Assn, Inc (EIA sector: Electric Utility), and it feeds WAPA Rocky Mountain.
When did Dolores Canyon Solar open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.