Geothermal power plant · Mineral, NV

Don A Campbell 2 Geothermal

Don A Campbell 2 Geothermal is a 20 MW geothermal power plant in Mineral County, Nevada, operated by ORNI 37 LLC. Its oldest generator still running came online in 2015. In 2025 it generated 89 GWh, about what 8,500 average Nevada homes use in a year.

Capacity20 MWNameplate, September 2026
Generated89 GWhIn 2025
Capacity factor51%Share of the most it could make, 2025
Generators1Oldest from 2015

Don A Campbell 2 Geothermal in context

Among the 30 other-fuel plants in Nevada in the EIA's inventory, it is the 23rd largest, about 1.9% of the state's 1.0 GW of other-fuel capacity.

Mineral County has 3 power plants of 1 MW or more with 90 MW in all; Don A Campbell 2 Geothermal is 22% of that and the 2nd largest of 2 geothermal plants there.

Its capacity factor of 51% in 2025 is higher than the 25% typical for geothermal plants across the US.

The average electricity customer in Mineral County goes 12 hours a year without power, the 2nd most of 12 counties in Nevada. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 89
050100150200201920212023202589

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Don A Campbell 2 Geothermal (outlined) and other plants in Mineral County, shaded. 38.836, -118.325.

Plant facts

Operator
ORNI 37 LLC
Sector
IPP Non-CHP
Grid operator
NEVP
County
Mineral County, NV
EIA plant ID
60419
Where Nevada's power comes from → Nevada power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
DAC2G Geothermal 20 MW 2015 –

Nearby

Other plants in Mineral County

Questions

Don A Campbell 2 Geothermal, answered

How much power does Don A Campbell 2 Geothermal produce?

Don A Campbell 2 Geothermal has 20 MW of capacity from one generator. In 2025 it generated 89 GWh, 51% of the most it could have made running flat out all year (its capacity factor).

How many homes does Don A Campbell 2 Geothermal power?

Its 2025 output of 89 GWh equals the yearly electricity use of about 8,500 average Nevada homes (868 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Don A Campbell 2 Geothermal?

Don A Campbell 2 Geothermal is in Mineral County, Nevada, at about 38.836°, -118.325°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Mineral County goes 12 hours a year without power, the 2nd most of 12 counties in Nevada. The county's page has the full outage record.

Who operates Don A Campbell 2 Geothermal?

It is operated by ORNI 37 LLC (EIA sector: IPP Non-CHP), and it feeds NV Energy.

When did Don A Campbell 2 Geothermal open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Nevada home's 868 kWh a month in 2025. Methodology.