Hydro power plant · Sevier, TN
Douglas Dam
Douglas Dam is a 151 MW hydro power plant in Sevier County, Tennessee, operated by Tennessee Valley Authority. Its oldest generator still running came online in 1943. In 2025 it generated 341 GWh, about what 24,000 average Tennessee homes use in a year.
Douglas Dam in context
Among the 28 hydro plants in Tennessee in the EIA's inventory, it is the 7th largest, about 6.0% of the state's 2.5 GW of hydro capacity.
Its capacity factor of 26% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Sevier County goes 9.6 hours a year without power, the 13th most of 73 counties in Tennessee. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Douglas Dam (outlined) and other plants in Sevier County, shaded. 35.962, -83.539.
Plant facts
- Operator
- Tennessee Valley Authority
- Sector
- Electric Utility
- Grid operator
- TVA
- County
- Sevier County, TN
- EIA plant ID
- 3400
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 2 | Conventional Hydroelectric | 41 MW | 1949 | – |
| 4 | Conventional Hydroelectric | 41 MW | 1954 | – |
| 1 | Conventional Hydroelectric | 37 MW | 1944 | – |
| 3 | Conventional Hydroelectric | 32 MW | 1943 | – |
Questions
Douglas Dam, answered
How much power does Douglas Dam produce?
Douglas Dam has 151 MW of capacity from 4 generators. In 2025 it generated 341 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Douglas Dam power?
Its 2025 output of 341 GWh equals the yearly electricity use of about 24,000 average Tennessee homes (1,180 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Douglas Dam?
Douglas Dam is in Sevier County, Tennessee, at about 35.962°, -83.539°. The average electricity customer in Sevier County goes 9.6 hours a year without power, the 13th most of 73 counties in Tennessee. The county's page has the full outage record.
Who operates Douglas Dam?
It is operated by Tennessee Valley Authority (EIA sector: Electric Utility), and it feeds the Tennessee Valley Authority.
When did Douglas Dam open?
Its oldest generator still running came online in 1943.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Tennessee home's 1,180 kWh a month in 2025. Methodology.