Solar power plant · Saline, IL
Eldorado Solar II
Eldorado Solar II is a 120 MW solar power plant in Saline County, Illinois, operated by Sol Systems. Its oldest generator still running came online in 2025. In 2025 it generated 39 GWh, about what 4,600 average Illinois homes use in a year.
Eldorado Solar II in context
Among the 476 solar plants in Illinois in the EIA's inventory, it is the 17th largest, about 2.0% of the state's 5.9 GW of solar capacity.
Saline County has 2 power plants of 1 MW or more with 270 MW in all; Eldorado Solar II is 44% of that and the 2nd largest of 2 solar plants there.
The average electricity customer in Saline County goes 7.7 hours a year without power, the 14th most of 101 counties in Illinois. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Eldorado Solar II (outlined) and other plants in Saline County, shaded. 37.869, -88.426.
Plant facts
- Operator
- Sol Systems
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Saline County, IL
- EIA plant ID
- 69143
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ELD12 | Solar Photovoltaic | 120 MW | 2025 | – |
Nearby
Other plants in Saline County
Questions
Eldorado Solar II, answered
How much power does Eldorado Solar II produce?
Eldorado Solar II has 120 MW of capacity from one generator. In 2025 it generated 39 GWh.
How many homes does Eldorado Solar II power?
Its 2025 output of 39 GWh equals the yearly electricity use of about 4,600 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Eldorado Solar II?
Eldorado Solar II is in Saline County, Illinois, at about 37.869°, -88.426°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Saline County goes 7.7 hours a year without power, the 14th most of 101 counties in Illinois. The county's page has the full outage record.
Who operates Eldorado Solar II?
It is operated by Sol Systems (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Eldorado Solar II open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.