Solar power plant · Tompkins, NY
Ellis Solar
Ellis Solar is a 18 MW solar power plant in Tompkins County, New York, operated by Altus Power America Management, LLC. Its oldest generator still running came online in 2019. In 2025 it generated 28 GWh, about what 3,900 average New York homes use in a year.
Ellis Solar in context
Among the 730 solar plants in New York in the EIA's inventory, it is the 18th largest, about 0.6% of the state's 3.2 GW of solar capacity.
Tompkins County has 17 power plants of 1 MW or more with 119 MW in all; Ellis Solar is 15% of that and the largest of 15 solar plants there.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Tompkins County goes 3.8 hours a year without power, the 49th most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ellis Solar (outlined) and other plants in Tompkins County, shaded. 42.445, -76.433.
Plant facts
- Operator
- Altus Power America Management, LLC
- Sector
- IPP Non-CHP
- Grid operator
- NYIS
- County
- Tompkins County, NY
- EIA plant ID
- 62413
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ELLIS | Solar Photovoltaic | 18 MW | 2019 | – |
Nearby
Other plants in Tompkins County
Questions
Ellis Solar, answered
How much power does Ellis Solar produce?
Ellis Solar has 18 MW of capacity from one generator. In 2025 it generated 28 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ellis Solar power?
Its 2025 output of 28 GWh equals the yearly electricity use of about 3,900 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ellis Solar?
Ellis Solar is in Tompkins County, New York, at about 42.445°, -76.433°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Tompkins County goes 3.8 hours a year without power, the 49th most of 62 counties in New York. The county's page has the full outage record.
Who operates Ellis Solar?
It is operated by Altus Power America Management, LLC (EIA sector: IPP Non-CHP), and it feeds the New York ISO.
When did Ellis Solar open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.