Solar power plant · Ellis, TX

Ellis Solar LLC

Ellis Solar LLC is a 80 MW solar power plant in Ellis County, Texas, operated by 174 Power Global Corp.. Its oldest generator still running came online in 2023. In 2025 it generated 165 GWh, about what 12,000 average Texas homes use in a year.

Capacity80 MWNameplate, September 2026
Generated165 GWhIn 2025
Capacity factor24%Share of the most it could make, 2025
Generators1Oldest from 2023

Ellis Solar LLC in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 152nd largest, about 0.2% of the state's 37 GW of solar capacity.

Ellis County has 5 power plants of 1 MW or more with 2.5 GW in all; Ellis Solar LLC is 3% of that and the 2nd largest of 2 solar plants there.

Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Ellis County goes 7.7 hours a year without power, the 153rd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200202320242025GWh 165
050100150200202320242025165

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Ellis Solar LLC (outlined) and other plants in Ellis County, shaded. 32.467, -97.054.

Plant facts

Operator
174 Power Global Corp.
Sector
IPP Non-CHP
Grid operator
ERCO
County
Ellis County, TX
EIA plant ID
63797
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GER01 Solar Photovoltaic 80 MW 2023 –

Questions

Ellis Solar LLC, answered

How much power does Ellis Solar LLC produce?

Ellis Solar LLC has 80 MW of capacity from one generator. In 2025 it generated 165 GWh, 24% of the most it could have made running flat out all year (its capacity factor).

How many homes does Ellis Solar LLC power?

Its 2025 output of 165 GWh equals the yearly electricity use of about 12,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Ellis Solar LLC?

Ellis Solar LLC is in Ellis County, Texas, at about 32.467°, -97.054°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Ellis County goes 7.7 hours a year without power, the 153rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Ellis Solar LLC?

It is operated by 174 Power Global Corp. (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Ellis Solar LLC open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.