Solar power plant · Childress, TX

Fagus Solar Park

Fagus Solar Park is a 332 MW solar power plant in Childress County, Texas, operated by Excel Advantage Services, LLC. Its oldest generator still running came online in 2025.

Capacity332 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Fagus Solar Park in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 24th largest, about 0.9% of the state's 37 GW of solar capacity.

Childress County has 2 power plants of 1 MW or more with 572 MW in all; Fagus Solar Park is 58% of that and the largest of 2 solar plants there.

The average electricity customer in Childress County goes 11 hours a year without power, the 111th most of 240 counties in Texas. The county's page has the full outage record.

Where it is

Fagus Solar Park (outlined) and other plants in Childress County, shaded. 34.351, -100.049.

Plant facts

Operator
Excel Advantage Services, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Childress County, TX
EIA plant ID
67123
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MISII Solar Photovoltaic 332 MW 2025 –

Nearby

Other plants in Childress County

Questions

Fagus Solar Park, answered

How much power does Fagus Solar Park produce?

Fagus Solar Park has 332 MW of capacity from one generator. No full year of generation is reported yet.

Where is Fagus Solar Park?

Fagus Solar Park is in Childress County, Texas, at about 34.351°, -100.049°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Childress County goes 11 hours a year without power, the 111th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Fagus Solar Park?

It is operated by Excel Advantage Services, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Fagus Solar Park open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.