Wind power plant · Teton, MT
Fairfield Wind
Fairfield Wind is a 10 MW wind power plant in Teton County, Montana, operated by Greenbacker Renewable Energy Corporation. Its oldest generator still running came online in 2014. In 2025 it generated 28 GWh, about what 2,700 average Montana homes use in a year.
Fairfield Wind in context
Among the 23 wind plants in Montana in the EIA's inventory, it is the 20th largest, about 0.5% of the state's 2.1 GW of wind capacity.
Teton County has 3 power plants of 1 MW or more with 48 MW in all; Fairfield Wind is 21% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 32% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Teton County goes 11 hours a year without power, the 9th most of 35 counties in Montana. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Fairfield Wind (outlined) and other plants in Teton County, shaded. 47.723, -111.965.
Plant facts
- Operator
- Greenbacker Renewable Energy Corporation
- Sector
- IPP Non-CHP
- Grid operator
- NWMT
- County
- Teton County, MT
- EIA plant ID
- 58966
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| T 1-6 | Onshore Wind Turbine | 10 MW | 2014 | – |
Nearby
Other plants in Teton County
Questions
Fairfield Wind, answered
How much power does Fairfield Wind produce?
Fairfield Wind has 10 MW of capacity from one generator. In 2025 it generated 28 GWh, 32% of the most it could have made running flat out all year (its capacity factor).
How many homes does Fairfield Wind power?
Its 2025 output of 28 GWh equals the yearly electricity use of about 2,700 average Montana homes (853 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Fairfield Wind?
Fairfield Wind is in Teton County, Montana, at about 47.723°, -111.965°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Teton County goes 11 hours a year without power, the 9th most of 35 counties in Montana. The county's page has the full outage record.
Who operates Fairfield Wind?
It is operated by Greenbacker Renewable Energy Corporation (EIA sector: IPP Non-CHP), and it feeds balancing authority NWMT.
When did Fairfield Wind open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Montana home's 853 kWh a month in 2025. Methodology.