Nuclear power plant · Monroe, MI

Fermi

Fermi is a 1.3 GW nuclear power plant in Monroe County, Michigan, operated by DTE Electric Company. Its oldest generator still running came online in 1966. In 2025 it generated 9.9 TWh, about what 1,305,000 average Michigan homes use in a year.

Capacity1.3 GWNameplate, September 2026
Generated9.9 TWhIn 2025
Capacity factor89%Share of the most it could make, 2025
Generators5Oldest from 1966

Fermi in context

Among the 3 nuclear plants in Michigan in the EIA's inventory, it is the 2nd largest, about 29% of the state's 4.4 GW of nuclear capacity.

Monroe County has 3 power plants of 1 MW or more with 4.6 GW in all; Fermi is 28% of that.

Its capacity factor of 89% in 2025 is close to the 89% typical for nuclear plants across the US.

The average electricity customer in Monroe County goes 27 hours a year without power, the 15th most of 83 counties in Michigan. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02,0004,0006,0008,00010,00012,00020182019202020212022202320242025GWh 9,948
02,0004,0006,0008,00010,00012,00020192021202320259,948

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Fermi (outlined) and other plants in Monroe County, shaded. 41.963, -83.258.

Plant facts

Operator
DTE Electric Company
Sector
Electric Utility
Grid operator
MISO
County
Monroe County, MI
EIA plant ID
1729
  • Nuclear1.2 GW95%
  • Other64 MW5.0%
Where Michigan's power comes from → Michigan power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
2 Nuclear 1.2 GW 1988 –
3 Petroleum Liquids 16 MW 1966 –
4 Petroleum Liquids 16 MW 1966 –
GT1 Petroleum Liquids 16 MW 1966 –
GT2 Petroleum Liquids 16 MW 1966 –

Nearby

Other plants in Monroe County

Questions

Fermi, answered

How much power does Fermi produce?

Fermi has 1.3 GW of capacity from 5 generators. In 2025 it generated 9.9 TWh, 89% of the most it could have made running flat out all year (its capacity factor).

How many homes does Fermi power?

Its 2025 output of 9.9 TWh equals the yearly electricity use of about 1,305,000 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Fermi?

Fermi is in Monroe County, Michigan, at about 41.963°, -83.258°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Monroe County goes 27 hours a year without power, the 15th most of 83 counties in Michigan. The county's page has the full outage record.

Who operates Fermi?

It is operated by DTE Electric Company (EIA sector: Electric Utility), and it feeds MISO.

When did Fermi open?

Its oldest generator still running came online in 1966.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.