Wind power plant · Sherman, TX

Filet Wind (5) LLC

Filet Wind (5) LLC is a 10 MW wind power plant in Sherman County, Texas, operated by UPC Power Solutions. Its oldest generator still running came online in 2006. In 2025 it generated 11 GWh, about what 803 average Texas homes use in a year.

Capacity10 MWNameplate, September 2026
Generated11 GWhIn 2025
Capacity factor12%Share of the most it could make, 2025
Generators1Oldest from 2006

Filet Wind (5) LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 221st largest, about 0.0% of the state's 45 GW of wind capacity.

Sherman County has 2 power plants of 1 MW or more with 20 MW in all; Filet Wind (5) LLC is 50% of that and the largest of 2 wind plants there.

Its capacity factor of 12% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Sherman County goes 5.6 hours a year without power, the 189th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

051015202520182019202020212022202320242025GWh 11
0510152025201920212023202511

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Filet Wind (5) LLC (outlined) and other plants in Sherman County, shaded. 36.445, -101.876.

Plant facts

Operator
UPC Power Solutions
Sector
IPP Non-CHP
Grid operator
SWPP
County
Sherman County, TX
EIA plant ID
56561
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
JDW5 Onshore Wind Turbine 10 MW 2006 –

Nearby

Other plants in Sherman County

Questions

Filet Wind (5) LLC, answered

How much power does Filet Wind (5) LLC produce?

Filet Wind (5) LLC has 10 MW of capacity from one generator. In 2025 it generated 11 GWh, 12% of the most it could have made running flat out all year (its capacity factor).

How many homes does Filet Wind (5) LLC power?

Its 2025 output of 11 GWh equals the yearly electricity use of about 803 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Filet Wind (5) LLC?

Filet Wind (5) LLC is in Sherman County, Texas, at about 36.445°, -101.876°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Sherman County goes 5.6 hours a year without power, the 189th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Filet Wind (5) LLC?

It is operated by UPC Power Solutions (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did Filet Wind (5) LLC open?

Its oldest generator still running came online in 2006.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.