Fitchburg is a 58 MW natural gas power plant in Dane County, Wisconsin, operated by Madison Gas & Electric Co. Its oldest generator still running came online in 1973.
Fitchburg in context
Among the 38 natural gas plants in Wisconsin in the EIA's inventory, it is the 25th largest, about 0.7% of the state's 8.1 GW of natural gas capacity.
Dane County has 24 power plants of 1 MW or more with 1.2 GW in all; Fitchburg is 5% of that and the 4th largest of 7 natural gas plants there.
The average electricity customer in Dane County goes 1.2 hours a year without power, the 67th most of 72 counties in Wisconsin. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Where it is
Fitchburg (outlined) and other plants in Dane County, shaded. 43.015, -89.460.
Plant facts
- Operator
- Madison Gas & Electric Co
- Sector
- Electric Utility
- Grid operator
- MISO
- County
- Dane County, WI
- EIA plant ID
- 3991
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 29 MW | 1973 | – |
| 2 | Natural Gas Fired Combustion Turbine | 29 MW | 1973 | – |
Questions
Fitchburg, answered
How much power does Fitchburg produce?
Fitchburg has 58 MW of capacity from 2 generators. No full year of generation is reported yet.
Where is Fitchburg?
Fitchburg is in Dane County, Wisconsin, at about 43.015°, -89.460°. It is one of 24 power plants of 1 MW or more in the county. The average electricity customer in Dane County goes 1.2 hours a year without power, the 67th most of 72 counties in Wisconsin. The county's page has the full outage record.
Who operates Fitchburg?
It is operated by Madison Gas & Electric Co (EIA sector: Electric Utility), and it feeds MISO.
When did Fitchburg open?
Its oldest generator still running came online in 1973.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Methodology.