Wind power plant · Foard, TX
Foard City Wind
Foard City Wind is a 353 MW wind power plant in Foard County, Texas, operated by Foard City Wind, LLC. Its oldest generator still running came online in 2019. In 2025 it generated 1.1 TWh, about what 85,000 average Texas homes use in a year.
Foard City Wind in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 14th largest, about 0.8% of the state's 45 GW of wind capacity.
Foard County has 2 power plants of 1 MW or more with 555 MW in all; Foard City Wind is 64% of that and the largest of 2 wind plants there.
Its capacity factor of 37% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Foard County goes 20 hours a year without power. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Foard City Wind (outlined) and other plants in Foard County, shaded. 33.915, -99.740.
Plant facts
- Operator
- Foard City Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Foard County, TX
- EIA plant ID
- 61402
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| FOARD | Onshore Wind Turbine | 353 MW | 2019 | – |
Nearby
Other plants in Foard County
Questions
Foard City Wind, answered
How much power does Foard City Wind produce?
Foard City Wind has 353 MW of capacity from one generator. In 2025 it generated 1.1 TWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Foard City Wind power?
Its 2025 output of 1.1 TWh equals the yearly electricity use of about 85,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Foard City Wind?
Foard City Wind is in Foard County, Texas, at about 33.915°, -99.740°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Foard County goes 20 hours a year without power. The county's page has the full outage record.
Who operates Foard City Wind?
It is operated by Foard City Wind, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Foard City Wind open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.