Hydro power plant · Loudon, TN

Fort Loudoun

Fort Loudoun is a 153 MW hydro power plant in Loudon County, Tennessee, operated by Tennessee Valley Authority. Its oldest generator still running came online in 1943. In 2025 it generated 633 GWh, about what 45,000 average Tennessee homes use in a year.

Capacity153 MWNameplate, September 2026
Generated633 GWhIn 2025
Capacity factor47%Share of the most it could make, 2025
Generators4Oldest from 1943

Fort Loudoun in context

Among the 28 hydro plants in Tennessee in the EIA's inventory, it is the 6th largest, about 6.1% of the state's 2.5 GW of hydro capacity.

Loudon County has 3 power plants of 1 MW or more with 287 MW in all; Fort Loudoun is 53% of that and the largest of 2 hydro plants there.

Its capacity factor of 47% in 2025 is higher than the 34% typical for hydro plants across the US.

The average electricity customer in Loudon County goes 3.4 hours a year without power, the 49th most of 73 counties in Tennessee. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,50020182019202020212022202320242025GWh 633
05001,0001,5002019202120232025633

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Fort Loudoun (outlined) and other plants in Loudon County, shaded. 35.792, -84.243.

Plant facts

Operator
Tennessee Valley Authority
Sector
Electric Utility
Grid operator
TVA
County
Loudon County, TN
EIA plant ID
3402
Where Tennessee's power comes from → Tennessee power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
3 Conventional Hydroelectric 43 MW 1948 –
4 Conventional Hydroelectric 41 MW 1949 –
1 Conventional Hydroelectric 36 MW 1944 –
2 Conventional Hydroelectric 34 MW 1943 –

Nearby

Other plants in Loudon County

Questions

Fort Loudoun, answered

How much power does Fort Loudoun produce?

Fort Loudoun has 153 MW of capacity from 4 generators. In 2025 it generated 633 GWh, 47% of the most it could have made running flat out all year (its capacity factor).

How many homes does Fort Loudoun power?

Its 2025 output of 633 GWh equals the yearly electricity use of about 45,000 average Tennessee homes (1,180 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Fort Loudoun?

Fort Loudoun is in Loudon County, Tennessee, at about 35.792°, -84.243°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Loudon County goes 3.4 hours a year without power, the 49th most of 73 counties in Tennessee. The county's page has the full outage record.

Who operates Fort Loudoun?

It is operated by Tennessee Valley Authority (EIA sector: Electric Utility), and it feeds the Tennessee Valley Authority.

When did Fort Loudoun open?

Its oldest generator still running came online in 1943.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Tennessee home's 1,180 kWh a month in 2025. Methodology.