Wind power plant · DeKalb, IL
FPL Energy Illinois Wind LLC Hybrid
FPL Energy Illinois Wind LLC Hybrid is a 238 MW wind power plant in DeKalb County, Illinois, operated by FPL Energy Illinois Wind LLC. Its oldest generator still running came online in 2009. In 2025 it generated 630 GWh, about what 73,000 average Illinois homes use in a year.
FPL Energy Illinois Wind LLC Hybrid in context
Among the 56 wind plants in Illinois in the EIA's inventory, it is the 8th largest, about 2.7% of the state's 8.7 GW of wind capacity.
DeKalb County has 31 power plants of 1 MW or more with 306 MW in all; FPL Energy Illinois Wind LLC Hybrid is 78% of that.
Its capacity factor of 30% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in DeKalb County goes 1.4 hours a year without power, the 96th most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
FPL Energy Illinois Wind LLC Hybrid (outlined) and other plants in DeKalb County, shaded. 41.768, -88.887.
Plant facts
- Operator
- FPL Energy Illinois Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- DeKalb County, IL
- EIA plant ID
- 57325
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GE1.5 | Onshore Wind Turbine | 218 MW | 2009 | – |
| BFT | Batteries | 20 MW · 8 MWh | 2014 | – |
Nearby
Other plants in DeKalb County
Questions
FPL Energy Illinois Wind LLC Hybrid, answered
How much power does FPL Energy Illinois Wind LLC Hybrid produce?
FPL Energy Illinois Wind LLC Hybrid has 238 MW of capacity from 2 generators. In 2025 it generated 630 GWh, 30% of the most it could have made running flat out all year (its capacity factor).
How many homes does FPL Energy Illinois Wind LLC Hybrid power?
Its 2025 output of 630 GWh equals the yearly electricity use of about 73,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is FPL Energy Illinois Wind LLC Hybrid?
FPL Energy Illinois Wind LLC Hybrid is in DeKalb County, Illinois, at about 41.768°, -88.887°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in DeKalb County goes 1.4 hours a year without power, the 96th most of 101 counties in Illinois. The county's page has the full outage record.
Who operates FPL Energy Illinois Wind LLC Hybrid?
It is operated by FPL Energy Illinois Wind LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did FPL Energy Illinois Wind LLC Hybrid open?
Its oldest generator still running came online in 2009.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.