Wind power plant · Walla Walla, WA

FPL Energy Vansycle LLC (WA)

FPL Energy Vansycle LLC (WA) is a 177 MW wind power plant in Walla Walla County, Washington, operated by FPL Energy Vansycle LLC. Its oldest generator still running came online in 2001. In 2025 it generated 250 GWh, about what 22,000 average Washington homes use in a year.

Capacity177 MWNameplate, September 2026
Generated250 GWhIn 2025
Capacity factor16%Share of the most it could make, 2025
Generators1Oldest from 2001

FPL Energy Vansycle LLC (WA) in context

Among the 23 wind plants in Washington in the EIA's inventory, it is the 8th largest, about 5.2% of the state's 3.4 GW of wind capacity.

Walla Walla County has 4 power plants of 1 MW or more with 1.6 GW in all; FPL Energy Vansycle LLC (WA) is 11% of that.

Its capacity factor of 16% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Walla Walla County goes 2.3 hours a year without power, the 24th most of 31 counties in Washington. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 250
01002003004005002019202120232025250

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

FPL Energy Vansycle LLC (WA) (outlined) and other plants in Walla Walla County, shaded. 46.060, -118.917.

Plant facts

Operator
FPL Energy Vansycle LLC
Sector
IPP Non-CHP
Grid operator
BPAT
County
Walla Walla County, WA
EIA plant ID
55560
Where Washington's power comes from → Washington power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
V-47 Onshore Wind Turbine 177 MW 2001 –

Nearby

Other plants in Walla Walla County

Questions

FPL Energy Vansycle LLC (WA), answered

How much power does FPL Energy Vansycle LLC (WA) produce?

FPL Energy Vansycle LLC (WA) has 177 MW of capacity from one generator. In 2025 it generated 250 GWh, 16% of the most it could have made running flat out all year (its capacity factor).

How many homes does FPL Energy Vansycle LLC (WA) power?

Its 2025 output of 250 GWh equals the yearly electricity use of about 22,000 average Washington homes (945 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is FPL Energy Vansycle LLC (WA)?

FPL Energy Vansycle LLC (WA) is in Walla Walla County, Washington, at about 46.060°, -118.917°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Walla Walla County goes 2.3 hours a year without power, the 24th most of 31 counties in Washington. The county's page has the full outage record.

Who operates FPL Energy Vansycle LLC (WA)?

It is operated by FPL Energy Vansycle LLC (EIA sector: IPP Non-CHP), and it feeds the Bonneville Power Administration.

When did FPL Energy Vansycle LLC (WA) open?

Its oldest generator still running came online in 2001.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Washington home's 945 kWh a month in 2025. Methodology.