Solar power plant · Concho, TX

Galloway 2 Solar Farm

Galloway 2 Solar Farm is a 110 MW solar power plant in Concho County, Texas, operated by 224WB 8me LLC. Its oldest generator still running came online in 2023. In 2025 it generated 247 GWh, about what 19,000 average Texas homes use in a year.

Capacity110 MWNameplate, September 2026
Generated247 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2023

Galloway 2 Solar Farm in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 136th largest, about 0.3% of the state's 37 GW of solar capacity.

Concho County has 4 power plants of 1 MW or more with 1.0 GW in all; Galloway 2 Solar Farm is 11% of that and the 2nd largest of 2 solar plants there.

Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Concho County goes 18 hours a year without power, the 50th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300202320242025GWh 247
0100200300202320242025247

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Galloway 2 Solar Farm (outlined) and other plants in Concho County, shaded. 31.446, -99.903.

Plant facts

Operator
224WB 8me LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Concho County, TX
EIA plant ID
63343
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GS2SF Solar Photovoltaic 110 MW 2023 –

Questions

Galloway 2 Solar Farm, answered

How much power does Galloway 2 Solar Farm produce?

Galloway 2 Solar Farm has 110 MW of capacity from one generator. In 2025 it generated 247 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Galloway 2 Solar Farm power?

Its 2025 output of 247 GWh equals the yearly electricity use of about 19,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Galloway 2 Solar Farm?

Galloway 2 Solar Farm is in Concho County, Texas, at about 31.446°, -99.903°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Concho County goes 18 hours a year without power, the 50th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Galloway 2 Solar Farm?

It is operated by 224WB 8me LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Galloway 2 Solar Farm open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.