Solar power plant · Jackson, TX
Ganado Solar
Ganado Solar is a 221 MW solar power plant in Jackson County, Texas, operated by Enel Green Power NA, Inc.. Its oldest generator still running came online in 2023. In 2025 it generated 340 GWh, about what 26,000 average Texas homes use in a year.
Ganado Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 68th largest, about 0.6% of the state's 37 GW of solar capacity.
Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Jackson County goes 9.6 hours a year without power, the 123rd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ganado Solar (outlined) and other plants in Jackson County, shaded. 29.109, -96.529.
Plant facts
- Operator
- Enel Green Power NA, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Jackson County, TX
- EIA plant ID
- 67284
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GS1 | Solar Photovoltaic | 151 MW | 2023 | – |
| GBA | Batteries | 71 MW · 115 MWh | 2024 | – |
Questions
Ganado Solar, answered
How much power does Ganado Solar produce?
Ganado Solar has 221 MW of capacity from 2 generators. In 2025 it generated 340 GWh, 18% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ganado Solar power?
Its 2025 output of 340 GWh equals the yearly electricity use of about 26,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ganado Solar?
Ganado Solar is in Jackson County, Texas, at about 29.109°, -96.529°. The average electricity customer in Jackson County goes 9.6 hours a year without power, the 123rd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Ganado Solar?
It is operated by Enel Green Power NA, Inc. (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Ganado Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.