Solar power plant · Jackson, TX

Ganado Solar

Ganado Solar is a 221 MW solar power plant in Jackson County, Texas, operated by Enel Green Power NA, Inc.. Its oldest generator still running came online in 2023. In 2025 it generated 340 GWh, about what 26,000 average Texas homes use in a year.

Capacity221 MWNameplate, September 2026
Generated340 GWhIn 2025
Capacity factor18%Share of the most it could make, 2025
Generators2Oldest from 2023

Ganado Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 68th largest, about 0.6% of the state's 37 GW of solar capacity.

Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Jackson County goes 9.6 hours a year without power, the 123rd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400202320242025GWh 340
0100200300400202320242025340

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Ganado Solar (outlined) and other plants in Jackson County, shaded. 29.109, -96.529.

Plant facts

Operator
Enel Green Power NA, Inc.
Sector
IPP Non-CHP
Grid operator
ERCO
County
Jackson County, TX
EIA plant ID
67284
  • Solar151 MW68%
  • Storage71 MW32%
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GS1 Solar Photovoltaic 151 MW 2023 –
GBA Batteries 71 MW · 115 MWh 2024 –

Questions

Ganado Solar, answered

How much power does Ganado Solar produce?

Ganado Solar has 221 MW of capacity from 2 generators. In 2025 it generated 340 GWh, 18% of the most it could have made running flat out all year (its capacity factor).

How many homes does Ganado Solar power?

Its 2025 output of 340 GWh equals the yearly electricity use of about 26,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Ganado Solar?

Ganado Solar is in Jackson County, Texas, at about 29.109°, -96.529°. The average electricity customer in Jackson County goes 9.6 hours a year without power, the 123rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Ganado Solar?

It is operated by Enel Green Power NA, Inc. (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Ganado Solar open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.