Solar power plant · Kent, RI

GD West Greenwich Nooseneck I, LLC

GD West Greenwich Nooseneck I, LLC is a 20 MW solar power plant in Kent County, Rhode Island, operated by GD West Greenwich Nooseneck I, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 31 GWh, about what 4,600 average Rhode Island homes use in a year.

Capacity20 MWNameplate, September 2026
Generated31 GWhIn 2025
Capacity factor18%Share of the most it could make, 2025
Generators2Oldest from 2022

GD West Greenwich Nooseneck I, LLC in context

Among the 77 solar plants in Rhode Island in the EIA's inventory, it is the 4th largest, about 4.4% of the state's 452 MW of solar capacity.

Kent County has 18 power plants of 1 MW or more with 148 MW in all; GD West Greenwich Nooseneck I, LLC is 14% of that and the 3rd largest of 12 solar plants there.

Its capacity factor of 18% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Kent County goes 3.6 hours a year without power, the 4th most of 5 counties in Rhode Island. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010203040202320242025GWh 31
01020304020232024202531

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

GD West Greenwich Nooseneck I, LLC (outlined) and other plants in Kent County, shaded. 41.606, -71.647.

Plant facts

Operator
GD West Greenwich Nooseneck I, LLC
Sector
IPP Non-CHP
Grid operator
ISNE
County
Kent County, RI
EIA plant ID
67116
Where Rhode Island's power comes from → Rhode Island power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
NORTH Solar Photovoltaic 10 MW 2022 –
SOUTH Solar Photovoltaic 10 MW 2022 –

Nearby

Other plants in Kent County

Robin Hollow Solar · 41 MWUniversity Solar, LLC · 24 MWGold Meadow Farms · 16 MWHopkins Hill CSG · 6.6 MW10 Briggs Solar NG, LLC (East) · 5.0 MWWSD Coventry · 5.0 MWKilvert · 4.7 MWWED Coventry 2 · 4.5 MW

Questions

GD West Greenwich Nooseneck I, LLC, answered

How much power does GD West Greenwich Nooseneck I, LLC produce?

GD West Greenwich Nooseneck I, LLC has 20 MW of capacity from 2 generators. In 2025 it generated 31 GWh, 18% of the most it could have made running flat out all year (its capacity factor).

How many homes does GD West Greenwich Nooseneck I, LLC power?

Its 2025 output of 31 GWh equals the yearly electricity use of about 4,600 average Rhode Island homes (562 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is GD West Greenwich Nooseneck I, LLC?

GD West Greenwich Nooseneck I, LLC is in Kent County, Rhode Island, at about 41.606°, -71.647°. It is one of 18 power plants of 1 MW or more in the county. The average electricity customer in Kent County goes 3.6 hours a year without power, the 4th most of 5 counties in Rhode Island. The county's page has the full outage record.

Who operates GD West Greenwich Nooseneck I, LLC?

It is operated by GD West Greenwich Nooseneck I, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.

When did GD West Greenwich Nooseneck I, LLC open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Rhode Island home's 562 kWh a month in 2025. Methodology.