Solar power plant · Genesee, MI
Genesee Solar Project
Genesee Solar Project is a 41 MW solar power plant in Genesee County, Michigan, operated by Genesee Solar Energy, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 1.0 GWh, about what 131 average Michigan homes use in a year.
Genesee Solar Project in context
Among the 79 solar plants in Michigan in the EIA's inventory, it is the 22nd largest, about 1.2% of the state's 3.3 GW of solar capacity.
Genesee County has 10 power plants of 1 MW or more with 117 MW in all; Genesee Solar Project is 35% of that and the largest of 7 solar plants there.
The average electricity customer in Genesee County goes 5.5 hours a year without power, the 74th most of 83 counties in Michigan. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Genesee Solar Project (outlined) and other plants in Genesee County, shaded. 43.086, -83.665.
Plant facts
- Operator
- Genesee Solar Energy, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Genesee County, MI
- EIA plant ID
- 66756
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GS1 | Solar Photovoltaic | 41 MW | 2025 | – |
Nearby
Other plants in Genesee County
Questions
Genesee Solar Project, answered
How much power does Genesee Solar Project produce?
Genesee Solar Project has 41 MW of capacity from one generator. In 2025 it generated 1.0 GWh.
How many homes does Genesee Solar Project power?
Its 2025 output of 1.0 GWh equals the yearly electricity use of about 131 average Michigan homes (635 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Genesee Solar Project?
Genesee Solar Project is in Genesee County, Michigan, at about 43.086°, -83.665°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Genesee County goes 5.5 hours a year without power, the 74th most of 83 counties in Michigan. The county's page has the full outage record.
Who operates Genesee Solar Project?
It is operated by Genesee Solar Energy, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Genesee Solar Project open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Michigan home's 635 kWh a month in 2025. Methodology.