Solar power plant · Gibson, IN

Gibson Solar

Gibson Solar is a 200 MW solar power plant in Gibson County, Indiana, operated by Gibson Solar, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 142 GWh, about what 13,000 average Indiana homes use in a year.

Capacity200 MWNameplate, September 2026
Generated142 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Gibson Solar in context

Among the 124 solar plants in Indiana in the EIA's inventory, it is the 9th largest, about 3.9% of the state's 5.1 GW of solar capacity.

Gibson County has 2 power plants of 1 MW or more with 3.5 GW in all; Gibson Solar is 6% of that.

The average electricity customer in Gibson County goes 4.4 hours a year without power, the 41st most of 90 counties in Indiana. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Gibson Solar (outlined) and other plants in Gibson County, shaded. 38.318, -87.531.

Plant facts

Operator
Gibson Solar, LLC
Sector
Electric Utility
Grid operator
MISO
County
Gibson County, IN
EIA plant ID
68455
Where Indiana's power comes from → Indiana power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GIBBY Solar Photovoltaic 200 MW 2025 –

Nearby

Other plants in Gibson County

Questions

Gibson Solar, answered

How much power does Gibson Solar produce?

Gibson Solar has 200 MW of capacity from one generator. In 2025 it generated 142 GWh.

How many homes does Gibson Solar power?

Its 2025 output of 142 GWh equals the yearly electricity use of about 13,000 average Indiana homes (938 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Gibson Solar?

Gibson Solar is in Gibson County, Indiana, at about 38.318°, -87.531°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Gibson County goes 4.4 hours a year without power, the 41st most of 90 counties in Indiana. The county's page has the full outage record.

Who operates Gibson Solar?

It is operated by Gibson Solar, LLC (EIA sector: Electric Utility), and it feeds MISO.

When did Gibson Solar open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Indiana home's 938 kWh a month in 2025. Methodology.