Wind power plant · Mason, IL
Glacier Sands Wind Power, LLC
Glacier Sands Wind Power, LLC is a 185 MW wind power plant in Mason County, Illinois, operated by Glacier Sands Wind Power, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 632 GWh, about what 74,000 average Illinois homes use in a year.
Glacier Sands Wind Power, LLC in context
Among the 56 wind plants in Illinois in the EIA's inventory, it is the 25th largest, about 2.1% of the state's 8.7 GW of wind capacity.
Mason County has 6 power plants of 1 MW or more with 412 MW in all; Glacier Sands Wind Power, LLC is 45% of that and the largest of 2 wind plants there.
Its capacity factor of 39% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Mason County goes 3.1 hours a year without power, the 72nd most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Glacier Sands Wind Power, LLC (outlined) and other plants in Mason County, shaded. 40.261, -89.701.
Plant facts
- Operator
- Glacier Sands Wind Power, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Mason County, IL
- EIA plant ID
- 64381
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GS001 | Onshore Wind Turbine | 185 MW | 2021 | – |
Nearby
Other plants in Mason County
Questions
Glacier Sands Wind Power, LLC, answered
How much power does Glacier Sands Wind Power, LLC produce?
Glacier Sands Wind Power, LLC has 185 MW of capacity from one generator. In 2025 it generated 632 GWh, 39% of the most it could have made running flat out all year (its capacity factor).
How many homes does Glacier Sands Wind Power, LLC power?
Its 2025 output of 632 GWh equals the yearly electricity use of about 74,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Glacier Sands Wind Power, LLC?
Glacier Sands Wind Power, LLC is in Mason County, Illinois, at about 40.261°, -89.701°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Mason County goes 3.1 hours a year without power, the 72nd most of 101 counties in Illinois. The county's page has the full outage record.
Who operates Glacier Sands Wind Power, LLC?
It is operated by Glacier Sands Wind Power, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Glacier Sands Wind Power, LLC open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.