Wind power plant · Mason, IL

Glacier Sands Wind Power, LLC

Glacier Sands Wind Power, LLC is a 185 MW wind power plant in Mason County, Illinois, operated by Glacier Sands Wind Power, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 632 GWh, about what 74,000 average Illinois homes use in a year.

Capacity185 MWNameplate, September 2026
Generated632 GWhIn 2025
Capacity factor39%Share of the most it could make, 2025
Generators1Oldest from 2021

Glacier Sands Wind Power, LLC in context

Among the 56 wind plants in Illinois in the EIA's inventory, it is the 25th largest, about 2.1% of the state's 8.7 GW of wind capacity.

Mason County has 6 power plants of 1 MW or more with 412 MW in all; Glacier Sands Wind Power, LLC is 45% of that and the largest of 2 wind plants there.

Its capacity factor of 39% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Mason County goes 3.1 hours a year without power, the 72nd most of 101 counties in Illinois. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020212022202320242025GWh 632
020040060080020212022202320242025632

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Glacier Sands Wind Power, LLC (outlined) and other plants in Mason County, shaded. 40.261, -89.701.

Plant facts

Operator
Glacier Sands Wind Power, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Mason County, IL
EIA plant ID
64381
Where Illinois's power comes from → Illinois power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GS001 Onshore Wind Turbine 185 MW 2021 –

Nearby

Other plants in Mason County

Moraine Sands Wind Power · 171 MWSalt Creek Township Solar, LLC · 50 MWClark Solar 1 · 2.0 MWClark Solar 1A · 2.0 MWClark Solar 2, LLC · 2.0 MW

Questions

Glacier Sands Wind Power, LLC, answered

How much power does Glacier Sands Wind Power, LLC produce?

Glacier Sands Wind Power, LLC has 185 MW of capacity from one generator. In 2025 it generated 632 GWh, 39% of the most it could have made running flat out all year (its capacity factor).

How many homes does Glacier Sands Wind Power, LLC power?

Its 2025 output of 632 GWh equals the yearly electricity use of about 74,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Glacier Sands Wind Power, LLC?

Glacier Sands Wind Power, LLC is in Mason County, Illinois, at about 40.261°, -89.701°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Mason County goes 3.1 hours a year without power, the 72nd most of 101 counties in Illinois. The county's page has the full outage record.

Who operates Glacier Sands Wind Power, LLC?

It is operated by Glacier Sands Wind Power, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Glacier Sands Wind Power, LLC open?

Its oldest generator still running came online in 2021.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.