Wind power plant · Cherokee, IA
Glaciers Edge Wind Project
Glaciers Edge Wind Project is a 212 MW wind power plant in Cherokee County, Iowa, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2019. In 2025 it generated 828 GWh, about what 80,000 average Iowa homes use in a year.
Glaciers Edge Wind Project in context
Among the 123 wind plants in Iowa in the EIA's inventory, it is the 18th largest, about 1.6% of the state's 13 GW of wind capacity.
Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Cherokee County goes 2.1 hours a year without power, the 72nd most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Glaciers Edge Wind Project (outlined) and other plants in Cherokee County, shaded. 42.862, -95.772.
Plant facts
- Operator
- EDF Renewable Asset Holdings, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Cherokee County, IA
- EIA plant ID
- 62035
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEW | Onshore Wind Turbine | 212 MW | 2019 | – |
Questions
Glaciers Edge Wind Project, answered
How much power does Glaciers Edge Wind Project produce?
Glaciers Edge Wind Project has 212 MW of capacity from one generator. In 2025 it generated 828 GWh, 45% of the most it could have made running flat out all year (its capacity factor).
How many homes does Glaciers Edge Wind Project power?
Its 2025 output of 828 GWh equals the yearly electricity use of about 80,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Glaciers Edge Wind Project?
Glaciers Edge Wind Project is in Cherokee County, Iowa, at about 42.862°, -95.772°. The average electricity customer in Cherokee County goes 2.1 hours a year without power, the 72nd most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Glaciers Edge Wind Project?
It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Glaciers Edge Wind Project open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.