Solar power plant · Meigs, OH

Great Bend Solar Project

Great Bend Solar Project is a 48 MW solar power plant in Meigs County, Ohio, operated by Great Bend Solar LLC. Its oldest generator still running came online in 2025. In 2025 it generated 2.7 GWh, about what 257 average Ohio homes use in a year.

Capacity48 MWNameplate, September 2026
Generated2.7 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Great Bend Solar Project in context

Among the 77 solar plants in Ohio in the EIA's inventory, it is the 31st largest, about 1.0% of the state's 5.0 GW of solar capacity.

Meigs County has 2 power plants of 1 MW or more with 95 MW in all; Great Bend Solar Project is 50% of that.

The average electricity customer in Meigs County goes 13 hours a year without power, the 8th most of 88 counties in Ohio. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Great Bend Solar Project (outlined) and other plants in Meigs County, shaded. 39.003, -81.771.

Plant facts

Operator
Great Bend Solar LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Meigs County, OH
EIA plant ID
67834
Where Ohio's power comes from → Ohio power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GBSP1 Solar Photovoltaic 48 MW 2025 –

Nearby

Other plants in Meigs County

Questions

Great Bend Solar Project, answered

How much power does Great Bend Solar Project produce?

Great Bend Solar Project has 48 MW of capacity from one generator. In 2025 it generated 2.7 GWh.

How many homes does Great Bend Solar Project power?

Its 2025 output of 2.7 GWh equals the yearly electricity use of about 257 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Great Bend Solar Project?

Great Bend Solar Project is in Meigs County, Ohio, at about 39.003°, -81.771°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Meigs County goes 13 hours a year without power, the 8th most of 88 counties in Ohio. The county's page has the full outage record.

Who operates Great Bend Solar Project?

It is operated by Great Bend Solar LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Great Bend Solar Project open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.