Wind power plant · Hamilton, IA
Great Pathfinder Wind
Great Pathfinder Wind is a 224 MW wind power plant in Hamilton County, Iowa, operated by Great Pathfinder Wind. Its oldest generator still running came online in 2023. In 2025 it generated 810 GWh, about what 78,000 average Iowa homes use in a year.
Great Pathfinder Wind in context
Among the 123 wind plants in Iowa in the EIA's inventory, it is the 16th largest, about 1.7% of the state's 13 GW of wind capacity.
Hamilton County has 4 power plants of 1 MW or more with 452 MW in all; Great Pathfinder Wind is 50% of that and the largest of 2 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Hamilton County goes 2.4 hours a year without power, the 69th most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Great Pathfinder Wind (outlined) and other plants in Hamilton County, shaded. 42.214, -93.877.
Plant facts
- Operator
- Great Pathfinder Wind
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Hamilton County, IA
- EIA plant ID
- 65715
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GPFWF | Onshore Wind Turbine | 224 MW | 2023 | – |
Nearby
Other plants in Hamilton County
Questions
Great Pathfinder Wind, answered
How much power does Great Pathfinder Wind produce?
Great Pathfinder Wind has 224 MW of capacity from one generator. In 2025 it generated 810 GWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Great Pathfinder Wind power?
Its 2025 output of 810 GWh equals the yearly electricity use of about 78,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Great Pathfinder Wind?
Great Pathfinder Wind is in Hamilton County, Iowa, at about 42.214°, -93.877°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Hamilton County goes 2.4 hours a year without power, the 69th most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Great Pathfinder Wind?
It is operated by Great Pathfinder Wind (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Great Pathfinder Wind open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.