Solar power plant · Clearfield, PA
Green Acres PA
Green Acres PA is a 20 MW solar power plant in Clearfield County, Pennsylvania, operated by Madison Energy Investments LLC. Its oldest generator still running came online in 2026.
Green Acres PA in context
Among the 82 solar plants in Pennsylvania in the EIA's inventory, it is the 26th largest, about 1.6% of the state's 1.2 GW of solar capacity.
Clearfield County has 4 power plants of 1 MW or more with 692 MW in all; Green Acres PA is 3% of that and the 3rd largest of 3 solar plants there.
The average electricity customer in Clearfield County goes 8.6 hours a year without power, the 21st most of 67 counties in Pennsylvania. The county's page has the full outage record.
Where it is
Green Acres PA (outlined) and other plants in Clearfield County, shaded. 40.819, -78.414.
Plant facts
- Operator
- Madison Energy Investments LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Clearfield County, PA
- EIA plant ID
- 70459
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| SP435 | Solar Photovoltaic | 20 MW | 2026 | – |
Nearby
Other plants in Clearfield County
Questions
Green Acres PA, answered
How much power does Green Acres PA produce?
Green Acres PA has 20 MW of capacity from one generator. No full year of generation is reported yet.
Where is Green Acres PA?
Green Acres PA is in Clearfield County, Pennsylvania, at about 40.819°, -78.414°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Clearfield County goes 8.6 hours a year without power, the 21st most of 67 counties in Pennsylvania. The county's page has the full outage record.
Who operates Green Acres PA?
It is operated by Madison Energy Investments LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Green Acres PA open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.