Natural gas power plant · Darke, OH
Greenville Electric Generating Station
Greenville Electric Generating Station is a 236 MW natural gas power plant in Darke County, Ohio, operated by Buckeye Power, Inc. Its oldest generator still running came online in 2000. In 2025 it generated 82 GWh, about what 7,800 average Ohio homes use in a year.
Greenville Electric Generating Station in context
Among the 48 natural gas plants in Ohio in the EIA's inventory, it is the 23rd largest, about 1.2% of the state's 20 GW of natural gas capacity.
Darke County has 4 power plants of 1 MW or more with 248 MW in all; Greenville Electric Generating Station is 95% of that.
Its capacity factor of 4% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Darke County goes 5.1 hours a year without power, the 47th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Greenville Electric Generating Station (outlined) and other plants in Darke County, shaded. 40.076, -84.615.
Plant facts
- Operator
- Buckeye Power, Inc
- Sector
- Electric Utility
- Grid operator
- PJM
- County
- Darke County, OH
- EIA plant ID
- 55228
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GT1 | Natural Gas Fired Combustion Turbine | 59 MW | 2000 | – |
| GT2 | Natural Gas Fired Combustion Turbine | 59 MW | 2000 | – |
| GT3 | Natural Gas Fired Combustion Turbine | 59 MW | 2000 | – |
| GT4 | Natural Gas Fired Combustion Turbine | 59 MW | 2000 | – |
Nearby
Other plants in Darke County
Questions
Greenville Electric Generating Station, answered
How much power does Greenville Electric Generating Station produce?
Greenville Electric Generating Station has 236 MW of capacity from 4 generators. In 2025 it generated 82 GWh, 4% of the most it could have made running flat out all year (its capacity factor).
How many homes does Greenville Electric Generating Station power?
Its 2025 output of 82 GWh equals the yearly electricity use of about 7,800 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Greenville Electric Generating Station?
Greenville Electric Generating Station is in Darke County, Ohio, at about 40.076°, -84.615°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Darke County goes 5.1 hours a year without power, the 47th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Greenville Electric Generating Station?
It is operated by Buckeye Power, Inc (EIA sector: Electric Utility), and it feeds PJM Interconnection.
When did Greenville Electric Generating Station open?
Its oldest generator still running came online in 2000.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.