Solar power plant · Hamilton, TX
Grizzly Ridge Solar
Grizzly Ridge Solar is a 100 MW solar power plant in Hamilton County, Texas, operated by Grizzly Ridge Solar LLC. Its oldest generator still running came online in 2023. In 2025 it generated 118 GWh, about what 8,800 average Texas homes use in a year.
Grizzly Ridge Solar in context
Among the 250 solar plants in Texas in the EIA's inventory, it is the 148th largest, about 0.3% of the state's 37 GW of solar capacity.
Its capacity factor of 13% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Hamilton County goes 3.4 hours a year without power, the 218th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Grizzly Ridge Solar (outlined) and other plants in Hamilton County, shaded. 31.738, -98.214.
Plant facts
- Operator
- Grizzly Ridge Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Hamilton County, TX
- EIA plant ID
- 66410
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 375 | Solar Photovoltaic | 100 MW | 2023 | – |
Planned
| Generator | Technology | Capacity | Expected |
|---|---|---|---|
| 596 | Batteries | 10 MW | 2026 |
Questions
Grizzly Ridge Solar, answered
How much power does Grizzly Ridge Solar produce?
Grizzly Ridge Solar has 100 MW of capacity from one generator. In 2025 it generated 118 GWh, 13% of the most it could have made running flat out all year (its capacity factor).
How many homes does Grizzly Ridge Solar power?
Its 2025 output of 118 GWh equals the yearly electricity use of about 8,800 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Grizzly Ridge Solar?
Grizzly Ridge Solar is in Hamilton County, Texas, at about 31.738°, -98.214°. The average electricity customer in Hamilton County goes 3.4 hours a year without power, the 218th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Grizzly Ridge Solar?
It is operated by Grizzly Ridge Solar LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Grizzly Ridge Solar open?
Its oldest generator still running came online in 2023. 1 more generator is planned.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.