Wind power plant · Hancock, IA

Hancock County Wind Energy Center

Hancock County Wind Energy Center is a 98 MW wind power plant in Hancock County, Iowa, operated by FPL Energy Hancock County Wind, LLC. Its oldest generator still running came online in 2002. In 2025 it generated 256 GWh, about what 25,000 average Iowa homes use in a year.

Capacity98 MWNameplate, September 2026
Generated256 GWhIn 2025
Capacity factor30%Share of the most it could make, 2025
Generators1Oldest from 2002

Hancock County Wind Energy Center in context

Among the 123 wind plants in Iowa in the EIA's inventory, it is the 59th largest, about 0.7% of the state's 13 GW of wind capacity.

Hancock County has 3 power plants of 1 MW or more with 448 MW in all; Hancock County Wind Energy Center is 22% of that and the 3rd largest of 3 wind plants there.

Its capacity factor of 30% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Hancock County goes 5.5 hours a year without power, the 27th most of 98 counties in Iowa. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040020182019202020212022202320242025GWh 256
01002003004002019202120232025256

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hancock County Wind Energy Center (outlined) and other plants in Hancock County, shaded. 43.053, -93.630.

Plant facts

Operator
FPL Energy Hancock County Wind, LLC
Sector
IPP Non-CHP
Grid operator
MISO
County
Hancock County, IA
EIA plant ID
56010
Where Iowa's power comes from → Iowa power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
V-47 Onshore Wind Turbine 98 MW 2002 –

Questions

Hancock County Wind Energy Center, answered

How much power does Hancock County Wind Energy Center produce?

Hancock County Wind Energy Center has 98 MW of capacity from one generator. In 2025 it generated 256 GWh, 30% of the most it could have made running flat out all year (its capacity factor).

How many homes does Hancock County Wind Energy Center power?

Its 2025 output of 256 GWh equals the yearly electricity use of about 25,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hancock County Wind Energy Center?

Hancock County Wind Energy Center is in Hancock County, Iowa, at about 43.053°, -93.630°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Hancock County goes 5.5 hours a year without power, the 27th most of 98 counties in Iowa. The county's page has the full outage record.

Who operates Hancock County Wind Energy Center?

It is operated by FPL Energy Hancock County Wind, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.

When did Hancock County Wind Energy Center open?

Its oldest generator still running came online in 2002.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.