Happy Solar 1
Happy Solar 1 is a 95 MW solar power plant in White County, Arkansas, operated by Lightsource Renewable Energy Asset Management, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 215 GWh, about what 17,000 average Arkansas homes use in a year.
Happy Solar 1 in context
Among the 70 solar plants in Arkansas in the EIA's inventory, it is the 18th largest, about 3.4% of the state's 2.8 GW of solar capacity.
White County has 4 power plants of 1 MW or more with 209 MW in all; Happy Solar 1 is 45% of that and the 2nd largest of 4 solar plants there.
Its capacity factor of 26% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in White County goes 4.8 hours a year without power, the 61st most of 73 counties in Arkansas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Happy Solar 1 (outlined) and other plants in White County, shaded. 35.168, -91.660.
Plant facts
- Operator
- Lightsource Renewable Energy Asset Management, LLC
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- White County, AR
- EIA plant ID
- 63766
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ARHA1 | Solar Photovoltaic | 95 MW | 2023 | – |
Nearby
Other plants in White County
Questions
Happy Solar 1, answered
How much power does Happy Solar 1 produce?
Happy Solar 1 has 95 MW of capacity from one generator. In 2025 it generated 215 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Happy Solar 1 power?
Its 2025 output of 215 GWh equals the yearly electricity use of about 17,000 average Arkansas homes (1,076 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Happy Solar 1?
Happy Solar 1 is in White County, Arkansas, at about 35.168°, -91.660°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in White County goes 4.8 hours a year without power, the 61st most of 73 counties in Arkansas. The county's page has the full outage record.
Who operates Happy Solar 1?
It is operated by Lightsource Renewable Energy Asset Management, LLC (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Happy Solar 1 open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Arkansas home's 1,076 kWh a month in 2025. Methodology.