Solar power plant · Hardin, OH

Hardin Solar III

Hardin Solar III is a 250 MW solar power plant in Hardin County, Ohio, operated by Hardin Solar Energy III. Its oldest generator still running came online in 2025. In 2025 it generated 471 GWh, about what 45,000 average Ohio homes use in a year.

Capacity250 MWNameplate, September 2026
Generated471 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Hardin Solar III in context

Among the 77 solar plants in Ohio in the EIA's inventory, it is the 5th largest, about 5.0% of the state's 5.0 GW of solar capacity.

Hardin County has 5 power plants of 1 MW or more with 619 MW in all; Hardin Solar III is 40% of that and the largest of 4 solar plants there.

The average electricity customer in Hardin County goes 3.2 hours a year without power, the 71st most of 88 counties in Ohio. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Hardin Solar III (outlined) and other plants in Hardin County, shaded. 40.682, -83.794.

Plant facts

Operator
Hardin Solar Energy III
Sector
IPP Non-CHP
Grid operator
PJM
County
Hardin County, OH
EIA plant ID
68591
Where Ohio's power comes from → Ohio power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HARD3 Solar Photovoltaic 250 MW 2025 –

Nearby

Other plants in Hardin County

Questions

Hardin Solar III, answered

How much power does Hardin Solar III produce?

Hardin Solar III has 250 MW of capacity from one generator. In 2025 it generated 471 GWh.

How many homes does Hardin Solar III power?

Its 2025 output of 471 GWh equals the yearly electricity use of about 45,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Hardin Solar III?

Hardin Solar III is in Hardin County, Ohio, at about 40.682°, -83.794°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Hardin County goes 3.2 hours a year without power, the 71st most of 88 counties in Ohio. The county's page has the full outage record.

Who operates Hardin Solar III?

It is operated by Hardin Solar Energy III (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Hardin Solar III open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Ohio home's 874 kWh a month in 2025. Methodology.