Wind power plant · Bremer, IA
Hawkeye Wind Farm
Hawkeye Wind Farm is a 35 MW wind power plant in Bremer County, Iowa, operated by Greenbacker Renewable Energy Corporation. Its oldest generator still running came online in 2012. In 2025 it generated 171 GWh, about what 17,000 average Iowa homes use in a year.
Hawkeye Wind Farm in context
Among the 123 wind plants in Iowa in the EIA's inventory, it is the 78th largest, about 0.3% of the state's 13 GW of wind capacity.
Bremer County has 6 power plants of 1 MW or more with 84 MW in all; Hawkeye Wind Farm is 42% of that and the largest of 2 wind plants there.
Its capacity factor of 56% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Bremer County goes 0.9 hours a year without power, the 96th most of 98 counties in Iowa. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hawkeye Wind Farm (outlined) and other plants in Bremer County, shaded. 42.949, -92.062.
Plant facts
- Operator
- Greenbacker Renewable Energy Corporation
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Bremer County, IA
- EIA plant ID
- 57832
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| NORD | Onshore Wind Turbine | 35 MW | 2012 | – |
Nearby
Other plants in Bremer County
Questions
Hawkeye Wind Farm, answered
How much power does Hawkeye Wind Farm produce?
Hawkeye Wind Farm has 35 MW of capacity from one generator. In 2025 it generated 171 GWh, 56% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hawkeye Wind Farm power?
Its 2025 output of 171 GWh equals the yearly electricity use of about 17,000 average Iowa homes (861 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hawkeye Wind Farm?
Hawkeye Wind Farm is in Bremer County, Iowa, at about 42.949°, -92.062°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Bremer County goes 0.9 hours a year without power, the 96th most of 98 counties in Iowa. The county's page has the full outage record.
Who operates Hawkeye Wind Farm?
It is operated by Greenbacker Renewable Energy Corporation (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Hawkeye Wind Farm open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Iowa home's 861 kWh a month in 2025. Methodology.