Wind power plant · McCulloch, TX
Heart of Texas Wind Project
Heart of Texas Wind Project is a 180 MW wind power plant in McCulloch County, Texas, operated by Scout Clean Energy LLC. Its oldest generator still running came online in 2020. In 2025 it generated 642 GWh, about what 48,000 average Texas homes use in a year.
Heart of Texas Wind Project in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 124th largest, about 0.4% of the state's 45 GW of wind capacity.
McCulloch County has 2 power plants of 1 MW or more with 340 MW in all; Heart of Texas Wind Project is 53% of that and the largest of 2 wind plants there.
Its capacity factor of 41% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in McCulloch County goes 4.4 hours a year without power, the 205th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Heart of Texas Wind Project (outlined) and other plants in McCulloch County, shaded. 31.242, -99.421.
Plant facts
- Operator
- Scout Clean Energy LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- McCulloch County, TX
- EIA plant ID
- 61032
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HTX | Onshore Wind Turbine | 180 MW | 2020 | – |
Nearby
Other plants in McCulloch County
Questions
Heart of Texas Wind Project, answered
How much power does Heart of Texas Wind Project produce?
Heart of Texas Wind Project has 180 MW of capacity from one generator. In 2025 it generated 642 GWh, 41% of the most it could have made running flat out all year (its capacity factor).
How many homes does Heart of Texas Wind Project power?
Its 2025 output of 642 GWh equals the yearly electricity use of about 48,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Heart of Texas Wind Project?
Heart of Texas Wind Project is in McCulloch County, Texas, at about 31.242°, -99.421°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in McCulloch County goes 4.4 hours a year without power, the 205th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Heart of Texas Wind Project?
It is operated by Scout Clean Energy LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Heart of Texas Wind Project open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.