Solar power plant · Albany, NY
Hecate Energy Albany County 1
Hecate Energy Albany County 1 is a 20 MW solar power plant in Albany County, New York, operated by Greenbacker Renewable Energy Corporation. Its oldest generator still running came online in 2024. In 2025 it generated 28 GWh, about what 3,900 average New York homes use in a year.
Hecate Energy Albany County 1 in context
Among the 730 solar plants in New York in the EIA's inventory, it is the 9th largest, about 0.6% of the state's 3.2 GW of solar capacity.
Albany County has 31 power plants of 1 MW or more with 1.5 GW in all; Hecate Energy Albany County 1 is 1% of that and the 2nd largest of 22 solar plants there.
Its capacity factor of 16% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Albany County goes 5.8 hours a year without power, the 31st most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hecate Energy Albany County 1 (outlined) and other plants in Albany County, shaded. 42.515, -73.833.
Plant facts
- Operator
- Greenbacker Renewable Energy Corporation
- Sector
- IPP Non-CHP
- Grid operator
- NYIS
- County
- Albany County, NY
- EIA plant ID
- 64077
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ALBNY | Solar Photovoltaic | 20 MW | 2024 | – |
Nearby
Other plants in Albany County
Questions
Hecate Energy Albany County 1, answered
How much power does Hecate Energy Albany County 1 produce?
Hecate Energy Albany County 1 has 20 MW of capacity from one generator. In 2025 it generated 28 GWh, 16% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hecate Energy Albany County 1 power?
Its 2025 output of 28 GWh equals the yearly electricity use of about 3,900 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hecate Energy Albany County 1?
Hecate Energy Albany County 1 is in Albany County, New York, at about 42.515°, -73.833°. It is one of 31 power plants of 1 MW or more in the county. The average electricity customer in Albany County goes 5.8 hours a year without power, the 31st most of 62 counties in New York. The county's page has the full outage record.
Who operates Hecate Energy Albany County 1?
It is operated by Greenbacker Renewable Energy Corporation (EIA sector: IPP Non-CHP), and it feeds the New York ISO.
When did Hecate Energy Albany County 1 open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.