Wind power plant · Republic, KS

High Banks Wind

High Banks Wind is a 643 MW wind power plant in Republic County, Kansas, operated by High Banks Wind, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 2.5 TWh, about what 240,000 average Kansas homes use in a year.

Capacity643 MWNameplate, September 2026
Generated2.5 TWhIn 2025
Capacity factor45%Share of the most it could make, 2025
Generators1Oldest from 2023

High Banks Wind in context

Among the 52 wind plants in Kansas in the EIA's inventory, it is the largest, about 6.6% of the state's 9.7 GW of wind capacity.

Republic County has 2 power plants of 1 MW or more with 653 MW in all; High Banks Wind is 99% of that.

Its capacity factor of 45% in 2025 is higher than the 32% typical for wind plants across the US.

The average electricity customer in Republic County goes 2.7 hours a year without power, the 54th most of 81 counties in Kansas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

01,0002,0003,000202320242025GWh 2,520
01,0002,0003,0002023202420252,520

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

High Banks Wind (outlined) and other plants in Republic County, shaded. 39.816, -97.431.

Plant facts

Operator
High Banks Wind, LLC
Sector
IPP Non-CHP
Grid operator
SWPP
County
Republic County, KS
EIA plant ID
66156
Where Kansas's power comes from → Kansas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WT Onshore Wind Turbine 643 MW 2023 –

Nearby

Other plants in Republic County

Belleville · 9.4 MW

Questions

High Banks Wind, answered

How much power does High Banks Wind produce?

High Banks Wind has 643 MW of capacity from one generator. In 2025 it generated 2.5 TWh, 45% of the most it could have made running flat out all year (its capacity factor).

How many homes does High Banks Wind power?

Its 2025 output of 2.5 TWh equals the yearly electricity use of about 240,000 average Kansas homes (876 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is High Banks Wind?

High Banks Wind is in Republic County, Kansas, at about 39.816°, -97.431°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Republic County goes 2.7 hours a year without power, the 54th most of 81 counties in Kansas. The county's page has the full outage record.

Who operates High Banks Wind?

It is operated by High Banks Wind, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did High Banks Wind open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Kansas home's 876 kWh a month in 2025. Methodology.