Wind power plant · Schuyler, MO

High Prairie Wind Farm

High Prairie Wind Farm is a 400 MW wind power plant in Schuyler County, Missouri, operated by Union Electric Co - (MO). Its oldest generator still running came online in 2020. In 2025 it generated 466 GWh, about what 37,000 average Missouri homes use in a year.

Capacity400 MWNameplate, September 2026
Generated466 GWhIn 2025
Capacity factor13%Share of the most it could make, 2025
Generators1Oldest from 2020

High Prairie Wind Farm in context

Among the 14 wind plants in Missouri in the EIA's inventory, it is the largest, about 16% of the state's 2.5 GW of wind capacity.

Its capacity factor of 13% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Schuyler County goes 5.6 hours a year without power, the 47th most of 110 counties in Missouri. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,0001,200202020212022202320242025GWh 466
02004006008001,0001,200202020212022202320242025466

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

High Prairie Wind Farm (outlined) and other plants in Schuyler County, shaded. 40.398, -92.519.

Plant facts

Operator
Union Electric Co - (MO)
Sector
Electric Utility
Grid operator
MISO
County
Schuyler County, MO
EIA plant ID
62563
Where Missouri's power comes from → Missouri power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
HPWF Onshore Wind Turbine 400 MW 2020 –

Questions

High Prairie Wind Farm, answered

How much power does High Prairie Wind Farm produce?

High Prairie Wind Farm has 400 MW of capacity from one generator. In 2025 it generated 466 GWh, 13% of the most it could have made running flat out all year (its capacity factor).

How many homes does High Prairie Wind Farm power?

Its 2025 output of 466 GWh equals the yearly electricity use of about 37,000 average Missouri homes (1,037 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is High Prairie Wind Farm?

High Prairie Wind Farm is in Schuyler County, Missouri, at about 40.398°, -92.519°. The average electricity customer in Schuyler County goes 5.6 hours a year without power, the 47th most of 110 counties in Missouri. The county's page has the full outage record.

Who operates High Prairie Wind Farm?

It is operated by Union Electric Co - (MO) (EIA sector: Electric Utility), and it feeds MISO.

When did High Prairie Wind Farm open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Missouri home's 1,037 kWh a month in 2025. Methodology.