Hillcrest Solar is a 200 MW solar power plant in Brown County, Ohio, operated by Hillcrest Solar I, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 362 GWh, about what 35,000 average Ohio homes use in a year.
Hillcrest Solar in context
Among the 77 solar plants in Ohio in the EIA's inventory, it is the 7th largest, about 4.0% of the state's 5.0 GW of solar capacity.
Brown County has 2 power plants of 1 MW or more with 205 MW in all; Hillcrest Solar is 98% of that.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Brown County goes 8.8 hours a year without power, the 14th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hillcrest Solar (outlined) and other plants in Brown County, shaded. 39.077, -83.906.
Plant facts
- Operator
- Hillcrest Solar I, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Brown County, OH
- EIA plant ID
- 62200
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HILLC | Solar Photovoltaic | 200 MW | 2021 | – |
Nearby
Other plants in Brown County
Questions
Hillcrest Solar, answered
How much power does Hillcrest Solar produce?
Hillcrest Solar has 200 MW of capacity from one generator. In 2025 it generated 362 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hillcrest Solar power?
Its 2025 output of 362 GWh equals the yearly electricity use of about 35,000 average Ohio homes (874 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hillcrest Solar?
Hillcrest Solar is in Brown County, Ohio, at about 39.077°, -83.906°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Brown County goes 8.8 hours a year without power, the 14th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Hillcrest Solar?
It is operated by Hillcrest Solar I, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Hillcrest Solar open?
Its oldest generator still running came online in 2021.