Wind power plant · Logan, IL
Hilltopper Wind Project
Hilltopper Wind Project is a 185 MW wind power plant in Logan County, Illinois, operated by Hilltopper Wind Project, LLC. Its oldest generator still running came online in 2018. In 2025 it generated 474 GWh, about what 55,000 average Illinois homes use in a year.
Hilltopper Wind Project in context
Among the 56 wind plants in Illinois in the EIA's inventory, it is the 24th largest, about 2.1% of the state's 8.7 GW of wind capacity.
Logan County has 5 power plants of 1 MW or more with 726 MW in all; Hilltopper Wind Project is 25% of that and the 3rd largest of 4 wind plants there.
Its capacity factor of 29% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Logan County goes 6.9 hours a year without power, the 18th most of 101 counties in Illinois. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hilltopper Wind Project (outlined) and other plants in Logan County, shaded. 40.030, -89.381.
Plant facts
- Operator
- Hilltopper Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Logan County, IL
- EIA plant ID
- 61735
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 185 MW | 2018 | – |
Nearby
Other plants in Logan County
Questions
Hilltopper Wind Project, answered
How much power does Hilltopper Wind Project produce?
Hilltopper Wind Project has 185 MW of capacity from one generator. In 2025 it generated 474 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hilltopper Wind Project power?
Its 2025 output of 474 GWh equals the yearly electricity use of about 55,000 average Illinois homes (716 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hilltopper Wind Project?
Hilltopper Wind Project is in Logan County, Illinois, at about 40.030°, -89.381°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Logan County goes 6.9 hours a year without power, the 18th most of 101 counties in Illinois. The county's page has the full outage record.
Who operates Hilltopper Wind Project?
It is operated by Hilltopper Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Hilltopper Wind Project open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Illinois home's 716 kWh a month in 2025. Methodology.